Salco-Logo-Red-No-Bg

CO-OP Grande Cache

Date of Project: April – December 2022

Brief Summary: Asbestos abatement of ceilings, walls, and flooring within the store, alongside selective interior demolition. Additionally, our team conducted structural deconstruction of the wood building addition as part of the project.