Salco-Logo-Red-No-Bg

CO-OP Grande Cache

Date of Project: April – December 2022

Brief Summary: Asbestos abatement of ceilings, walls, and flooring within the store, alongside selective interior demolition. Additionally, our team conducted structural deconstruction of the wood building addition as part of the project. 

Related projects